Permit Fees
If any person commences any work before obtaining the necessary permit and inspection, fees shall be doubled. Each and every instance shall constitute a separate offense.
Residential or Recreational
100-amp .. $ 40.00
200-amp ... 60.00
201-400-amp, single phase .. 80.00
100-400-amp, three phase 100.00
401-amp and up single phase or three phase 100.00
Plus additional $0.07 per amp in excess of 400 amps
Swimming pools .. 30.00
Signs 20.00
Alterations 30.00
Industrial and commercial
$100.00 for the first $5,000.00, plus and additional $3.00 for each $1,000.00, or fraction thereof, in excess of $5,000.00
Residential (including duplexes
and apartments)
First bath ... $40.00
Each additional bath . 20.00
Water heater exchange . 10.00
Sewer repair or replacement . 20.00
Remodel 25.00
Commercial or Industrial
$5.00 per fixture as shown on plumbing plan
$50.00 minimum permit fee
$40.00 for the first unit, plus $20.00 for each additional unit
Recreational and Residential Sewer Pump Stations . 50.00
Change out $25.00 for first and $10.00 for each additional
1-4 outlets .. $25.00
Each additional outlet 2.00
Water heater exchange .. 10.00
For each public swimming pool $100.00
For each private swimming pool ... 25.00
1. Section
B101-Permit Fees
Mobile Home setup ... $100.00
Recreational Vehicle setup ...$40.00
$1,000.00 and less No Fee, unless inspection required,
in which case a $15.00 fee for each inspection shall be charged
$1,000.00 to $50,000 $40.00 for the first $10,000.00
plus $5.50 for each additional thousand or fraction thereof,
to and including $50,000.00
$50,000 to $100,000 .$260.00 for the first $50,000.00
plus $4.00 for each additional thousand or fraction thereof,
to and including $100,000.00
$100,000 to $500,000 .$460.00 for the first $100,000.00
plus $3.00 for each additional thousand or fraction thereof,
to and including $500,000.00
$500,000 and up . ..$1,660.00 for the first $500,000.00
plus $2.00 for each additional thousand or fraction thereof
2. Section
B102-Moving Fee
For the moving of any building or structure, the fee shall be $100.00
3. Section
B103-Demolition Fees
For the demolition of any building or structure, the fee shall be $100.00
Zoning Permit Fees
Minimum Fee $10.00 for the first $10,000.00
$15.00 for $10,000.00 to $50,000.00
$25.00 for $50,000.00 and up
Mobile home or Recreational Vehicle ...$20.00